Bunker Survey Calculation

marine cargo ship surveyors

The bunker calculation is simple and needs the following:
– Tank Sounding data and Tank Capacity Table. The Corrected Sounding means below is the sounding after correcting with vessel’s trim and list.
– Temperature of Oil on Tanks,
– Oil Density @15*C,
– Table ASTM 54B (VCF) and Table ASTM 56 (WCF).

Now we could go with sample of 1 tank to test the calculation.

Continue reading “Bunker Survey Calculation”